Install and joint low voltage underground cables and apparatus in the power industry
Overview
This standard is about installing and jointing low voltage underground cables and apparatus in an electricity power utilities environment. This could apply to new installations, replacement of existing cables and apparatus or for diversions or alterations. This could apply to both electrical transmission or electrical distribution networks and could typically apply to voltages from low voltage (LV) up to and including transmission voltages of 33,000 volts. Networks could be aligned with systems using traditional or emerging energy technologies.
This standard includes confirming instructions, carrying out risk assessments, isolating any live cables and justifying live working, installing cables and apparatus, testing and checking installations and completing documentation.
This standard is for crafts persons or technicians working for network owners or operators or their sub-contractors who are responsible for installing and jointing low voltage underground cables and apparatus on electrical networks. This could be carried out by people with different levels of network operational authorisation, but in each case, they will be required to have the degree of supervision which is required for their individual level of authority.
Performance Criteria
You must be able to:
identify work location using system information in line with organisational procedures
carry out all work within the remits of own authority and under the supervision of suitably authorised personnel when required
receive and confirm instructions about installation and jointing activities to be carried out in line with organisational procedures
carry out site specific risk assessments of work areas and condition of cables and apparatus to be worked on, identifying hazards and required control measures in line with organisational procedures
check the position of cables and apparatus in relation to other cables and apparatus and that cable routes conform to company specifications and are suitable for cable installation
isolate any live cables, check any de-energised cables and that the system is safe to work on in line with organisational operational safety rules
justify when live working is required in line with organisational procedures and carry out all installation and jointing activities in line with organisational procedures for live or deenergised working
communicate the status of cable and apparatus installation and jointing to affected parties and designated people when required and in line with organisational procedures
use approved plant, apparatus, tools, equipment and consumables for cable and apparatus installation and jointing in line with organisational procedures
work in line with health and safety, environmental and other relevant regulations, directives and guidance at all times
install, joint, earth and protect cables and apparatus in line with workplan, safety instructions and organisational procedures
carry out testing procedures before, during and after cable and apparatus installation and jointing in line with organisational procedures
check no damage has occurred to cables or apparatus for power or other utilities, and that completed cable and apparatus installation and jointing complies with organisational specifications
complete documentation for cable and apparatus installation and jointing in line with organisational procedures
confirm completed installation and jointing meet safety requirements before reenergisation of the network or energisation of any new cable sections or apparatus
leave work areas in a safe condition in line with organisational procedures
deal with network issues and complications in line with safety and organisational procedures
escalate issues that you cannot resolve to the designated person in line with organisational procedures when required
Knowledge and Understanding
You need to know and understand:
Electrical power principles including three phase alternating current and direct current theories; voltage; types of earthing system on the LV network, dynamic and static engineering systems; application of electrical and electronic circuit theory and interfaces between the system voltage
Electricity network design, construction, capabilities, complexities, operations, boundaries, topologies and control boundaries
Apparatus which makes up the transmission or distribution network and the design, operation, function and limitations of transmission or distribution plant and equipment, substations, transformers, overhead lines, switchgear and auxiliary equipment
Standard terminology, abbreviations and nomenclature in relation to cable and apparatus identification, and installation and jointing techniques
The regulatory requirements associated with safety while carrying out work associated in power networks on low voltage underground cables and apparatus
Organisational safe systems of work control measures for working on cable that have been made dead, isolating cables, proving dead, cables becoming live from alternative sources, screening from live equipment
How to assess the location, size and condition of site, trenches and excavations and safe procedures for access, egress and working in confined spaces
The general and inherent dangers of working with low voltage electrical systems of different voltages under outage and non-outage conditions and required measures to address them
Organisational procedures and safety instructions for receiving and confirming operational, network related instructions in normal and fault conditions, including remote and emerging technological advances
The principles of pre task and point of work dynamic risk assessment, when they are required and how to carry them out and record findings
Procedures for live or deenergised working, the steps to justify live working and the processes to follow
Operational restrictions, their purpose and actions to be taken and how to recognise and use physical signage and network diagram indicators
WHo to notify about network related operations, when to notify them and organisational procedures for doing so
Electricity network principles of operation of underground networks in normal and fault conditions and associated protective devices and their indicators in the event of system fault scenarios
Sources of system information and how to interpret them to identify cables, apparatus, points of isolation, earthing arrangements and network running arrangements, fusing and discrimination including system schematic diagrams, geographic records, work instructions, fault logs, protection data
The sequence of processes, procedures, stages and operational safety rules
The environmental impact of disposal, organisational decontamination procedures and what to do if things go wrong, including the use of spill kits
The approved plant, apparatus, tools, equipment and consumables required for cable and apparatus installation and jointing on low voltage networks, including insulated tools, and how to obtain, inspect, prepare, carry out pre-use checks, use, maintain and store them
Company specifications for cable installation including depth, bending radii and protection
Company specifications for jointing straight or branch transitions or pot ends and parallel networks for low voltage cables including for polymeric based cables, paper insulated mains cables, and other legacy cable types and apparatus
Safety, earthing, bonding, cable protection and joint protection materials and where and when they should be applied to prevent damage and moisture ingress
The purpose of visual, functional and electrical checks and tests for cables and apparatus, including at service termination, when they are required and how to carry them out including for insulation, continuity, voltage, polarity, earth loop impedance, phase rotation
Organisational procedures and systems for recording and storing operational information and to meet cybersecurity and data governance requirements, including role-based access, secure storage, audit logging, data retention
The route to authorisation and supervision at different levels and the training, experience and certification required for your role
Install and joint low voltage underground cables and apparatus in the power industry
Overview
This standard is about installing and jointing low voltage underground cables and apparatus in an electricity power utilities environment. This could apply to new installations, replacement of existing cables and apparatus or for diversions or alterations. This could apply to both electrical transmission or electrical distribution networks and could typically apply to voltages from low voltage (LV) up to and including transmission voltages of 33,000 volts. Networks could be aligned with systems using traditional or emerging energy technologies.
This standard includes confirming instructions, carrying out risk assessments, isolating any live cables and justifying live working, installing cables and apparatus, testing and checking installations and completing documentation.
This standard is for crafts persons or technicians working for network owners or operators or their sub-contractors who are responsible for installing and jointing low voltage underground cables and apparatus on electrical networks. This could be carried out by people with different levels of network operational authorisation, but in each case, they will be required to have the degree of supervision which is required for their individual level of authority.
Performance Criteria
You must be able to:
Knowledge and Understanding
You need to know and understand: